MICC un punto cerrado Si3N4 Nitruro de Silicio tubo de proteccion

FOB Reference Price:Get Latest Price
US $1-500 / Piece | 50 Piece/Pieces protection tube (Min. Order)
Supply Ability:
50000 Piece/Pieces per Month protection tube
Port:
shanghai or ningbo
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Liaoning, China (Mainland)
Brand Name:
MICC protection tube
Model Number:
protection tube
product name:
protection tube
brand name:
MICC protection tube
Material:
Si3N4
Application:
insulating or protection
Color:
gray
MOQ:
50pcs
Size:
customized
Shape:
protection tube
Type:
protection tube
Delivery time:
short
Packaging & Delivery
Packaging Details
Wooden box or carton for egis pipe
Delivery Time
10-30days according to your qtty

Product Description for protection tube 

 

Alumina Thermocouple protection tubes are available as a closed end tube with a reusable 
stainless steel coupling device. This device has 2 ways to use: the thermocouple protection tube 
can be hung by the flange or attached via the threaded end of the coupling device. 
 
Features: 
1. Materials: 95% alumina oxide, 99% alumina oxide 
2. Color: white, pink, light yellow
3. Shape: one end closed
4. Application: Used for all kinds of electric heating equipment and electric equipment, and textile machinery 

 

 Features for protection tube 

Tech-data

Test conditions

Unit

95% AL2O3

99.5% AL2O3

Density

 

g/cm3

> 3.60

3.7

Bending Strength

 

N/m3

2.24 × 108

> 2.74× 108

Linear Expansibility

20~1000C

a× 10¯ 6

-

-

20~5000C

a× 10¯ 6

6.2~7.5

6.2~7.5

20~8000C

a× 10¯ 6

6.5~8.0

6.5~8.0

Specific Inductive Capacity

1MHz

 

9~10

9~10.5

10GMHz

 

9~10

-

Dielectric Loss

1MHz

a× 10¯6

≤ 4

≤ 1.5

Tangent

10GMHz

a× 10¯6

≤ 10

-

Volume Resistance

1000C

Ω . cm

> 1013

> 1014

3000C

Ω . cm

> 1016

> 1012

5000C

Ω . cm

108

-

Breakdown Strength

 

KV/mm

15

-

Thermal Conductivity

200C

W/m. K

25.2

29.2

 

Max Temp Resistance for protection tube 

50% Al2O3

110C

75% Al2O3

125C

85% Al2O3

1400C

95% Al2O3

1500C

99% Al2O3

1600-1800C

 

Technique parameter:

 

CT95-4*6.5*0.7*700CT95-13*9*1500
CT95-4*6.5*0.7*750CT95-15 X 11 X 1000MM
CT95-5X 0,7 X 1000MM (4 FUROS)CT95-15 X 11 X 500MM
CT95-5*0.7*700MM(4 FUROS)CT95-15 X 11 X 700MM
CT95-6 X 4 X 700MMCT95-15*10*1100
CT95-7*5*1000CT95-15*10*1000
CT95-8*5*650CT95-17*13*1125
CT95-8*5*800mmCT95-18*12*1100
CT95-10*6*800CT95-20*10*1200
CT95-10*6*1000CT99-20*10*1200
CT95-10*6*1250CT95-20 X 15 X 500MM
CT95-10*7*400CT95-20 X 15 X 700MM
CT95-10*7*500MMCT95-20*15*800
CT95-10*7*600CT95-20*15*1000
CT95-10*7*650CT95-20*15*1100
CT95-10 *7 *700CT95-24*18*1100
CT95-10*7*1030CT95-24*18*1500
CT95-12*8*1000CT95-24 X 19 X 1000MM
CT95-12*8*800CT95-24*19*500MM
CT95-13*9*1000CT95-32*24*1100
 


Advantage
 

1.Low MOQ: It can meet your promotional business very well.

2.OEM Accepted : We can produce any your design as long as you provide us the drawing.

3.Good Service : We treat clients as friend.

4.Good Quality :We have strict quality control system .Good reputation in the foreigner market

5.Fast & Cheap Delivery: We have big discount from forwarder (Long Contract).

 

Product Show for protection tube 

 

 

Check below for more information on placing  

1. Inquiry-Professional and accurate quotation.

2. Confirm the price, trade term, lead time, artwork, payment term etc.

3. MICC sales send the Proforma Invoice with MICC seal.

4. Customer arranges the payment for deposit and sends us bank slip.

5.Initial Production step-Inform the clients that we have got the payment. And will make the samples according to your request, send you photos or Samples to get your approval. After approval, we inform that we will arrange the production & inform the estimated time.

6. Middle Production-send photos to show the production line which you can see your products in . Confirm the estimated delivery time again.

7. End Production-Mass production products photos.

8. Clients make payment for balance and MICC ships the goods. Inform the tracking number and check the status for clients.

9. The order is finished perfectly when you receive the goods and get satisfied with them .

10. Feedback to MICC about Quality , Service, Market Feedback & Suggestion. And we will do better .

 

Shipment for protection tube 

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like